Dairy

Dairy ERP Software

DotOne runs a dairy from milk collection to the morning dispatch: routes and centres, processing batches, products with a few days of shelf life, and distributor billing. Each day's numbers are in one place before the next collection starts.

What slows dairy businesses down

Collection data arrives late

Route-wise quantities, fat and SNF readings come in on slips or spreadsheets, and the plant plans the day without them.

Shelf life counted in days

Milk, curd and paneer have to move fast. Stock that sits a day too long in the cold room is a straight loss.

Farmer and society payments

Payments depend on quantity and quality for every supplier, and working them out by hand each cycle takes days.

Yield not tracked

Litres in and kilograms of product out are rarely matched by batch, so losses in processing stay hidden.

From first step to last, in one system

  1. 1

    Collect by route

    Milk received from each route or centre is recorded with quantity, fat and SNF against the supplier.

  2. 2

    Test at the plant

    Incoming milk is checked at the reception dock before it is accepted into the silo.

  3. 3

    Process in batches

    Pasteurisation, curd, paneer or ghee runs are logged as batches against a BOM, with yield recorded.

  4. 4

    Pack and store cold

    Finished packs go to the cold room by batch and date, oldest stock moved first.

  5. 5

    Dispatch and bill

    Morning dispatch goes route by route to distributors, with GST invoices and dues tracked per party.

Milk in by route. Product out by morning.

Demo data
Collection today morning shift
LitresFat %SNF %Route 1 · Karad8,420 ▲ 3%4.38.6Route 2 · Satara6,910 ▼ 2%4.18.5Route 3 · Wai5,280 ▲ 1%4.48.7
Total received
20,610 L ▲ 1.2%
3 routes · 46 centres
Yield vs standard
Paneer
18.6%
Curd
96.4%
Ghee
4.9%
Cold room · dispatch first
  1. Toned milk 500 ml · B-1012Today2,400 packs
  2. Curd 400 g · B-1009Today860 cups
  3. Paneer 200 g · B-10062 days310 packs
Production AgentPaneer yield on batch B-1011 is below standard for the third shift in a row. Route 2 fat is also down. Review drafted for the plant head.
Review Send reviewSent to plant head ✓

What teams run on DotOne

  • Route and centre collectionDaily milk quantity and quality by route, centre and supplier, as the base for supplier payments.
  • Batch yieldMilk issued against each batch and product made, so yield by product and shift can be compared.
  • Short-life stockCold room stock by batch and date, with what must be dispatched today shown first.
  • Distributor duesInvoices, crates and receipts against each distributor, with ageing for the accounts team.

Modules used

Frequently asked questions

Can DotOne record fat and SNF for each supplier?

Yes. Quality readings are recorded with each receipt, so they are available for supplier payment and for quality reports. How readings come in, by entry or from your existing testing setup, is agreed during onboarding.

Does DotOne calculate payments to farmers or societies?

Payment rules based on quantity and quality can be set up as part of your workflow during onboarding. Bills and payments then post to accounts and can sync to Tally.

How does DotOne handle products with a short shelf life?

Every pack is stocked by batch and date. Stock reports show the oldest batches first, and items close to their use-by date are flagged.

Can we see yield for each product?

Yes. Milk issued to a batch and the product received from it are both recorded, so yield by product, batch and shift shows in reports.

Follow one day of milk through DotOne

In a 30-minute demo we take a sample route collection through reception, a processing batch, cold room stock and the morning dispatch.