Break-Even Point Calculator

Enter your fixed costs, selling price and variable cost per unit to see the break-even point in units and in sales value, your contribution margin, and what you need to sell to reach a target profit.

Free, no sign-up Runs in your browser Nothing is stored
Rent, salaries, loan EMIs, power base charges: costs that do not change with output.
Material, packing, piece-rate labour, freight.

Break-even point

—

Everything is calculated in your browser. Nothing you enter is sent to us or stored.

On this page
  1. The break-even formula
  2. Units needed for a target profit
  3. Using break-even in a manufacturing business

The break-even formula

Break-even units = fixed costs ÷ (selling price − variable cost per unit)
Break-even sales = break-even units × selling price

The gap between price and variable cost is the contribution each unit makes towards fixed costs. Example: fixed costs of ₹6,00,000, a price of ₹450 and a variable cost of ₹300 give a contribution of ₹150 a unit. Break-even = 6,00,000 ÷ 150 = 4,000 units, or ₹18,00,000 of sales.

Units needed for a target profit

Units for target profit = (fixed costs + target profit) ÷ contribution per unit

For a profit of ₹1,50,000: (6,00,000 + 1,50,000) ÷ 150 = 5,000 units.

The margin of safety is how far expected sales are above break-even. Selling 5,000 units against a break-even of 4,000 gives a margin of safety of 1,000 units, or 20%.

Using break-even in a manufacturing business

  • Price a new product by checking the volume it must sell to cover the extra fixed cost it brings.
  • Judge a new machine: its EMI and running costs add to fixed costs. How many more units must you sell to stay at break-even? Use the EMI calculator for the repayment.
  • Watch variable cost. A rise in material prices cuts contribution and pushes break-even up. A 10% rise in variable cost in the example above raises break-even from 4,000 to 5,000 units.
  • Use real costs. Break-even is only as good as the variable cost you put in. Actual material use and scrap per job, recorded in your ERP, make it reliable.

Frequently asked questions

What is the break-even point?

The level of sales at which total revenue equals total cost, so the business makes neither a profit nor a loss.

How do you calculate break-even units?

Divide fixed costs by the contribution per unit, which is the selling price minus the variable cost per unit.

What is contribution margin?

The selling price minus the variable cost per unit. As a percentage, it is that contribution divided by the selling price.

What is the margin of safety?

How far expected sales are above the break-even point, in units, value or as a percentage of expected sales.

Can an ERP give me real variable costs?

Yes. When material issues, scrap and output are recorded per job, the actual variable cost per unit is known. See Production Management.

Know your real cost per unit

DotOne records material issued, output and scrap on every job card, so your costs come from the shop floor, not estimates.