DotOne runs sheet-metal, machined, forged, rubber and plastic part makers who supply OEMs and tier-1 companies. Schedules drive production, every batch is traceable back to its material, and inspection records are ready when the customer asks.
Customers revise schedules often. Planning in spreadsheets means either excess stock or a missed supply.
When a part fails, the customer wants the batch, the material lot and the inspection report the same day.
Prices are fixed for the year, so every rejected piece comes straight out of profit.
Many small dispatches each day, each needing an invoice, a challan and e-way bill details.
Customer orders and schedules are entered in sales, with quantities due by date.
BOMs show the material needed, and purchase orders are raised for the shortfall.
Job cards run machine-wise, with output, rejection and downtime recorded per shift.
Incoming, in-process and final inspections are recorded against each batch.
Parts are dispatched against the schedule with a GST invoice and e-way bill details.
Yes. Batches link the finished goods to the job card and the material lot issued to it, so a batch can be traced in both directions.
Yes. Incoming, in-process and final inspections are recorded in quality management, and Vision AI can add camera-based checks.
No. Automotive and rental covers vehicle dealers and rental businesses. This page is for manufacturers of parts and components.
Yes. OEE is calculated from the output and downtime recorded on the shop floor. See production management.
In a 30-minute demo we plan a schedule, run a batch, record its inspection and trace it back to the material lot.