DotOne runs machine builders, precision machining shops and heavy fabricators. Every order is planned from its bill of materials, tracked through job cards and outside processes, and costed from the material it actually used.
Each order has its own drawing and BOM, so estimates are made in spreadsheets and never compared with actuals.
Motors, bearings and castings arrive late and hold up assembly, because purchase started after production did.
Heat treatment, plating and machining go to vendors. Parts lying outside are tracked on paper challans.
Material, job work and rework are booked in different places, so margin per job is known only at year-end.
Enquiries are logged in CRM and quoted, with follow-ups until the order is won.
The multi-level BOM lists manufactured and bought-out parts, and purchase orders go out against the shortfall.
Job cards move parts through cutting, machining, welding and assembly.
Material sent for outside processes is tracked until it returns, and inspections are recorded at each stage.
The finished job is dispatched and invoiced with GST, and the job cost is compared with the quote.
Yes. Each order can carry its own BOM and job cards, so planning, purchase and costing are done for that order.
Yes. Material issued to a job worker and parts received back are both recorded. See production management.
Yes. Material issued, job work and sales value sit against the same order, so job-wise cost and margin can be reported.
The metal and steel page covers stock by weight and grade for steel products and trading. This page covers order-based engineering and fabrication.
In a 30-minute demo we take an order from quotation to BOM, purchase, job cards and dispatch, and show its job cost.