ERP Software for Engineering and Fabrication Companies

DotOne runs machine builders, precision machining shops and heavy fabricators. Every order is planned from its bill of materials, tracked through job cards and outside processes, and costed from the material it actually used.

What slows engineering businesses down

Engineer-to-order work

Each order has its own drawing and BOM, so estimates are made in spreadsheets and never compared with actuals.

Long-lead bought-out items

Motors, bearings and castings arrive late and hold up assembly, because purchase started after production did.

Outside processes

Heat treatment, plating and machining go to vendors. Parts lying outside are tracked on paper challans.

Unknown job profit

Material, job work and rework are booked in different places, so margin per job is known only at year-end.

From first step to last, in one system

  1. 1

    Enquiry and quotation

    Enquiries are logged in CRM and quoted, with follow-ups until the order is won.

  2. 2

    BOM and purchase

    The multi-level BOM lists manufactured and bought-out parts, and purchase orders go out against the shortfall.

  3. 3

    Job cards

    Job cards move parts through cutting, machining, welding and assembly.

  4. 4

    Job work and QC

    Material sent for outside processes is tracked until it returns, and inspections are recorded at each stage.

  5. 5

    Dispatch and bill

    The finished job is dispatched and invoiced with GST, and the job cost is compared with the quote.

What teams run on DotOne

  • Multi-level BOMsAssemblies, sub-assemblies and bought-out parts in one structure.
  • Job-wise material issueMaterial issued against each job card, so job cost comes from real consumption.
  • Outside job workChallans out and receipts in for every outside process.
  • Inspection recordsStage and final inspections stored against the job.

Modules used

Frequently asked questions

Does DotOne suit engineer-to-order businesses?

Yes. Each order can carry its own BOM and job cards, so planning, purchase and costing are done for that order.

Can we track parts sent out for machining or plating?

Yes. Material issued to a job worker and parts received back are both recorded. See production management.

Can we see profit per job?

Yes. Material issued, job work and sales value sit against the same order, so job-wise cost and margin can be reported.

How is this different from the metal industry page?

The metal and steel page covers stock by weight and grade for steel products and trading. This page covers order-based engineering and fabrication.

See an engineering job in DotOne

In a 30-minute demo we take an order from quotation to BOM, purchase, job cards and dispatch, and show its job cost.