Products are built from parts that are built from other parts. DotOne holds each level as its own BOM, so sub-assemblies, base mixes and intermediates are planned, made and costed in the right order, and shortages show up before the line stops.
The BOM is not just a list. It decides what to buy, what to make first and what each batch costs.
Sub-assemblies are made separately with their own routing, then issued as components into the parent BOM.
Assembled products use multi-level BOMs and job cards; chemicals, food and adhesives use formula and recipe BOMs.
Material is checked against the BOM and reserved from stock for each work order, so shortages show early.
Shortages against the BOM show before work starts, and items below reorder level raise purchase indents.
The cost of each batch is calculated from actual material use against the BOM.
Each grade or variant can be its own item with its own BOM.
From BOM to finished goods.
Set up the BOM for each level, from raw material to finished product.
Sales orders become the production plan.
Material is checked and reserved against each work order.
Lower levels are made first and issued into the parent.
Actual use is compared with the BOM for each batch.
Watches job cards and machines, flags delays and downtime, and checks material before jobs start.
See what the agent doesA bill of materials in layers: the finished product lists sub-assemblies, and each sub-assembly has its own BOM of parts or ingredients. Our BOM setup guide shows how to build one.
Yes. Recipes and formulations are set up as layered BOMs, for example a base mix used in several products.
Yes. Material is checked and reserved against the BOM, shortages show early, and items below reorder level raise purchase indents.
Yes. Batch cost is worked out from actual material use.
In a 30-minute demo we set up a two-level BOM and run a work order through it.